Tommy Walsh's Eco House
Tommy Walsh's Eco House (2007)
TV DIY star Tommy Walsh is set the challenge of a lifetime. In this series we see Tommy and his team push their talents right to the edge, going beyond anything he has previously attempted on TV.....to build an eco-friendly house in 60 days for £60K!
Cast
Seasons
Season 1
Can you build an eco-friendly home in 60 days for £60k? Builder Tommy Walsh decided to find out. Together with his building team, Walsh undertook the project in what he calls the worst summer in the past 50 years, although that might have been a good thing for what he calls the central feature of the house's eco-friendly aspect - a water harvesting tank, intended to supply water to the toilets, dishwasher and washing machine in the two-bedroom, two-storey house. Despite the deluge of rain, the team slogs on, aiming for the 60-day timeframe.
E1 Introduction
The DIY guru attempts to build an affordable eco-friendly home in 60 days with a limited budget.
E2 Installing Rainwater-Harvesting Drainage System
The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.
E3 Block-And-Beam Floor Delay
With the block-and-beam floor nowhere to be seen, the team tries to come up with a solution to allow the bricklayers to begin their work.
E4 Damp-Proof Membrane & Thermal Blocks
To improve the house's energy efficiency, a damp-proof membrane is laid to prevent heat loss and thermal blocks are used instead of concrete increasing, the house's thermal efficiency.
E5 First-Floor Joists & Timber Frame Roof
The joists for the first floor are installed along with the timber frame that forms the basis of the roof. And the team try to eat doughnuts without licking their lips.
E6 Polyurethane Wall Insulation
Polyurethane wall insulation is added, and the team considers installing supportive wooden pegs called 'nogs'.
E7 Roof Slates & Solar Panels
The roof slates and solar panels are fitted to the house, and the team learns the property will be the most energy-efficient in the Fens.
E8 Exterior Cladding & Under-Floor Heating
The house starts to take shape as the exterior cladding is fitted and the under-floor heating is installed.
E9 Rooms Boarded & Special Water Tank
The rooms are boarded in preparation for plastering, and a special water tank becomes the latest environmentally friendly addition to the project.
E10 Completing The Project
With the deadline looming, there's still a lot to do. Tommy and the team work on the fitting the staircase, tiling, electrics and plumbing in a bid to complete the project.
Similar
Grand Designs
Extreme Makeover: Home Edition
Dexter's Laboratory
Top Gear
Knight Rider
LEGO Masters
In the House
Lab Rats
WWE ECW
WWE Saturday Night's Main Event
Sea Hunt
Limitless with Chris Hemsworth
Where to Watch
Originally on:
Discovery
Not currently streaming in the US
Streaming data by JustWatch